BATHROOM RENOVATIONS
COMPLETE RENOVATION AND FIXTURE REPLACEMENT
- SHOWER WALL TILES REMOVED AND DISPOSED
- BASEBOARDS REMOVED AND DISPODED
- MIRRORS AND PAPER HOLDER ETC. REMOVED
- TUB REMOVED AND DISPOSED
- TOILET AND VANITY REMOVED AND DISPOSED
- FLOORING REMOVED AND DISPOSED
- ALL FRAMIING AND DRYWALL CHECKED FOR CONDITION [ WATER DAMAGED ]
- NEW SUB FLOOR INSTALLED IF REQUIIRED
- BATH FAN WITH TIMER INSTALLED AND DUCTED TO THE EXTERIOR
- NEW FLOORING INSTALLED AND PROTECTED [ TILES TO BE DONE AT END OF PROJECT ]
- LINO TO BE INSTALLED UNDER VANITY AND TUB
- REDIRECT ANY PLUMBING FOR LAYOUT CHANGES
- INSTALL NEW SHUT OFF VALVES FOR TOILET AND VANITY TAPS
- NEW TUB / SHOWER INSTALLED C/W SHOWER VALVE & TUB FILLER
- CEMENT PANELS INSTALLED FOR SHOWER WALL FINISH
- DRYWALL TRANSITIONS FINISHED READY FOR PAINT
- NEW VANITY AND TOP INSTALLED
- NEW BASIN AND FAUCET INSTALLED
- WALLS AND CEILING PAINTED TO OWNERS SPECS
- PRE-PAINTED BASEBOARDS INSTALLED
- TOILET INSTALLED
- MIRROR, PAPER HOLDER, TOWLE BAR ETC. INSTALLED
ALL MATERIALS ARE RECYLED WHERE POSSIBLE